Can you replace a roof in winter in Wisconsin? Yes, within limits the thermometer sets

All three big shingle makers allow winter installs, and all three change the rules when it gets cold, mainly hand sealing and underlayment that will not stick below 40 degrees. Here is what that means on an Eau Claire roof, month by month.

Yes, you can replace a roof in winter in Wisconsin. GAF says its Timberline HDZ shingles can be installed year round, and Owens Corning and CertainTeed both publish cold-weather instructions. What changes is the procedure. Owens Corning draws the line at 40 degrees, air and roof surface both: at or below it, the adhesive strip may not activate until warmer weather arrives, so the perimeter shingles get hand sealed and every field shingle goes on with a gap of no more than a sixteenth of an inch where shingle ends meet.

In Eau Claire, 40 degrees is most of the problem. NOAA’s 1991 to 2020 normals for Chippewa Valley Regional Airport give January an average high of 23 degrees, with a daily high of 40 or better on fewer than two days all month. A winter roof here is a cold-weather roof, and it gets put on by the cold-weather rules.

Installing shingles in winter: what the cold changes

Asphalt shingles are held down by nails and a strip of thermal sealant that bonds each row to the one below. GAF’s instructions say the sealant needs sun and warm temperatures to do that, and that shingles which never see adequate surface heat, or whose sealant gets dirty, may never seal. So the makers substitute hand sealing. Owens Corning calls for four one-inch dabs of asphalt roofing cement under each perimeter shingle, two dabs under each tab on a 3-tab roof, and warns that too much cement blisters the shingle. GAF requires every shingle to be hand sealed through prolonged cold, with four quarter-sized dabs.

Cold also makes shingles brittle. GAF warns they break easily in cold weather and that heavier premium shingles can crack at sharp bends, and CertainTeed says shingles must be warm enough to form over hips, ridges, and valleys without cracking. The workarounds are practical. GAF says to store the bundles in a space heated above 70 degrees the day before, and CertainTeed’s manual passes along a contractor’s habit of riding the ridge caps in a truck cab with the heater running for 20 minutes before they are bent.

Ice and water membrane below 40 degrees

The underlayment is stricter than the shingles, and on a low-pitch Eau Claire roof it is the part the code cares about. Wisconsin’s dwelling code, SPS 321.28(4), requires ice dam protection on shingle roofs of 4:12 or less over heated space, in the form of sheet metal or a self-adhered membrane labeled to ASTM D1970. On a shingle roof it is nearly always the membrane, and a membrane only works if it sticks.

MembraneMinimum to apply
GAF StormGuard and WeatherWatch45 degrees air; below 40 air, the rolls themselves must be at least 45
Owens Corning WeatherLock40 degrees, air and deck both
CertainTeed WinterGuardAbove 40 degrees
Grace Ice & Water Shield40 degrees, air, deck, and membrane

CertainTeed allows WinterGuard to be nailed in colder weather but says plainly that nailing it cannot provide protection from ice dams. So the membrane waits for a day warm enough for the product being used. Only GAF’s allows colder air, and then only if the rolls were stored overnight at 55 degrees or better and are at least 45 when they go down.

How many winter days work in Eau Claire

From the same NOAA normals, the average number of days each month when the high reaches 40 degrees, with the average high and low in degrees:

MonthDays reaching 40Average highAverage low
November15.64225
December4.42913
January1.8236
February4.5289
March16.74121

November and March are workable roofing months with care, and the 40 degree days usually come in the middle of the day, after the frost burns off the deck. December through February average just under eleven such days combined. Shingle work still happens then, hand sealed and scheduled around the forecast, but it is slower, and the underlayment days are the scarce ones.

Metal roofs in winter

A metal roof has no sealant strip to wait on, which makes steel the easier roof to put on in January. The panels go on in the cold, but the membrane underneath still needs a day that meets its number; Owens Corning’s WeatherLock for metal roofs goes down at 40 degrees and rising. The smaller cold limits sit in the trim work: McElroy Metal’s installation guide says tape and tube sealants may stiffen and lose adhesion below 20 degrees and suggests keeping them heated until use. The metal roofing page covers the panel systems.

When a winter roof replacement makes sense

A roof that is leaking into the house, storm damage the insurer has already approved, or a sale that cannot wait for April all justify a winter job, and done to the makers’ cold-weather rules it is a sound roof. An active leak that needs a stopgap first is an emergency roof repair call. An old roof that is simply wearing out can wait for spring; book it in late winter, when lead times are shortest. The roof replacement page walks through the tear-off, the timeline, and the cost.

Winter roof replacement: questions we get

Will new shingles blow off before they seal?

New shingles put on in the cold do not blow off when they are hand sealed. The dabs of asphalt roofing cement hold each shingle down until spring sun warms the factory strip enough to bond, and the nails do the rest. The makers differ on how many shingles get the dabs: Owens Corning's minimum is every shingle on the perimeter, where wind gets under first, and GAF requires every shingle through prolonged cold. Ask whether a winter bid hand seals the perimeter or the whole roof.

Can you tear off a roof with snow on it?

A roof with snow on it can be torn off, one section at a time. Snow and ice come off the area being worked that day, the old roofing comes off, and nothing new goes down until the deck is dry, because self-adhered ice and water membrane will not bond to a wet or frosty board. Any part of the deck still open at the end of a short December day gets tarped. Snow in the forecast moves the schedule; a job does not get opened ahead of a storm.

Is it cheaper to replace a roof in winter?

Replacing a roof in winter is rarely cheaper in Eau Claire, though it is usually faster to get on the schedule. Late winter and early spring lead times run one to three weeks against four to eight at the summer peak. The work itself takes more labor in the cold: hand sealing, warming materials, clearing snow, and shorter days. If the roof can wait, the savings are in timing, not price. If it cannot, a winter job done to the makers' cold-weather rules is a sound roof.

Where this fits: this page goes deep on one question from our roof replacement page, which covers the whole job, and the homepage covers everything we do in Eau Claire.